SPDC (Shell Petroleum Development) BOGT Tank 21 Project – Nigeria

Supply of 620 Tonnes A36 Steel Plates

Dorman Long

Seamless Line Pipes A333

GR6 & Special Pipe Made From Bar Bored to 457mm O.D x 366.72mm I.D LF2 BAR

Ready within 7-10 Working Days

DAEWOO / Elkarino

Supplied over 30 Tonnes of Check Globe Valves / Valves / Pressure Gauges / Line Pipe / Pipe Fittings / Flanges / Stud bolts / Shutdown Valves / Solenoid Valves etc

Material grades supplied: WCC/316 – WCB/316 – LF2/F51 – A333/GR6 – A420/WPL6 – A193L7/STDBTGR4 A194 Nuts – A182/F316L

NextOil / EWT

Supply of Line Pipe – Material Grades A106 / GRB , A333 / GR6 to a Stringent Specifications

End user SPDC Nigeria

Carried out various Electrical, Controls & Chemical line installation across various subsea assets

Performed isolation and barrier testing on Wells, manifolds, SDU and any potential source of hazard before intervention works could begin

Installation and connection of dynamic risers to subsea structures

Installation of Riser Clamps and Guard on platforms structure under water

Perform SCM changeout on subsea wellheads

Installation, connection and leak testing of jumper and dropdown spools